
Oswal investment Ltd has commenced remedial works on the Ashiaman Afienya stretched aimed at easing congestion of commuters.
The roads minister on Sunday undertook an emergency visit to the stretch where traffic congestion has compelled motorists to express their outrage.
Oswel is one of two contractors road minister Kwame Governs Agbodza directed to assume responsibility of remedial works on the Ashiaman-afienya aswell as the motorway -dawenya stretch.
Ongoing currently is earth reclamation where the contractor is using the same amounts of earth material in the remedial works.
It is estimated that with the use of the reclaimed soil, cost of the works will reduce by some 40 percent.
Don’t forget to subscribe for more Updates: https://www.youtube.com/c/TV3Ghana
#TV3Ghana
Visit the News Site: http://www.3news.com/ for more.
Follow us on Facebook: https://www.facebook.com/TV3GH/
Follow us on Twitter: https://twitter.com/tv3_ghana
Follow us on Instagram: https://www.instagram.com/tv3_ghana/
TV3 First in News Best in Entertainment.
The post Oswal begins work on Ashaiman Afienya road; reclaimed soil to cut cost by 40%, ease traffic first appeared on 3News.
Read Full Story
Facebook
Twitter
Pinterest
Instagram
Google+
YouTube
LinkedIn
RSS